  大型建站工程用电需求大、对供电稳定性要求高,选对发电设备直接关乎施工效率与成本管控。相较于传统柴油发电,焦化气发电机组凭借“变废为宝、成本低廉”的核心优势,成为建站工程的优选搭档。尤其是500千瓦机型,精准匹配大型建站工程用电体量,兼顾经济性与可靠性,今天就结合实打实的数据,唠透焦化气发电机组的硬核实力。

  Large scale station construction projects have a high demand for electricity and high requirements for power supply stability. Choosing the right power generation equipment directly affects construction efficiency and cost control. Compared to traditional diesel power generation, coking gas generator sets have become the preferred partner for station construction projects due to their core advantages of "turning waste into treasure and low cost". Especially for the 500 kW model, it accurately matches the electricity consumption of large-scale power station construction projects, balancing economy and reliability. Today, based on actual data, we will talk about the hard core strength of coking gas generator units.

  先明确核心定位:焦化气发电机组属于燃气发电品类,以沼气、伴生气、焦化气等可燃性气体为燃料,主打“变废为宝”,既能消化工业生产或建站周边的可燃废气,又能高效转化为电能,完美契合绿色施工与降本增效的双重需求,这也是它相较于传统发电机组的核心竞争力。

  Firstly, clarify the core positioning: Coking gas power generation units belong to the category of gas-fired power generation, using combustible gases such as biogas, associated gas, and coking gas as fuel, with a focus on "turning waste into treasure". They can not only digest combustible waste gas from industrial production or station construction, but also efficiently convert it into electricity, perfectly meeting the dual needs of green construction and cost reduction and efficiency improvement. This is also their core competitiveness compared to traditional power generation units.

  聚焦建站工程常用的500千瓦焦化气发电机组,一组核心数据就能看出其适配性:额定功率500kW,额定电压400伏、额定电流900A,刚好满足大型建站工程的设备运转、临时照明等全域用电需求;机组尺寸为4.5米×1.5米×2.2米,净重8.7吨,体积紧凑、便于现场摆放,适配建站工地的复杂场地条件,无需额外占用大量施工空间。

  Focusing on the commonly used 500 kW coking gas generator set in station construction projects, its adaptability can be seen from a set of core data: rated power of 500kW, rated voltage of 400V, and rated current of 900A, which just meets the overall power demand for equipment operation, temporary lighting, and other large-scale station construction projects; The unit size is 4.5 meters x 1.5 meters x 2.2 meters, with a net weight of 8.7 tons. It is compact in size and easy to place on site, suitable for the complex site conditions of construction sites, without the need to occupy a large amount of additional construction space.

  发电量与成本是建站工程最关心的核心,这也是焦化气发电机组的优势所在。该机型日均产电量可达12000度,按年运行7000小时计算,年发电量可达840万度,完全能覆盖大型建站工程全周期用电需求,甚至可满足多台大型施工设备同步运转。成本方面,依托清洁燃气燃料优势,每度电成本远低于市电,参考行业数据,焦化气发电每度成本仅0.05-0.25元,相较于市电每度0.6-0.8元的价格,年可节省电费数百万元,长期使用性价比拉满。

  The power generation and cost are the core concerns of power station construction projects, which is also the advantage of coking gas power generation units. This model can generate an average of 12000 kWh of electricity per day, with an annual output of 8.4 million kWh calculated based on 7000 hours of operation. It can fully cover the full cycle electricity demand of large-scale construction projects and even meet the synchronous operation of multiple large-scale construction equipment. In terms of cost, relying on the advantage of clean gas fuel, the cost per kilowatt hour of electricity is much lower than that of commercial electricity. Referring to industry data, the cost per kilowatt hour of coking gas power generation is only 0.05-0.25 yuan. Compared with the price of 0.6-0.8 yuan per kilowatt hour of commercial electricity, it can save millions of yuan in electricity bills annually, and the long-term cost-effectiveness is fully realized.

  除了低成本,机组的可靠性与发电效率也有扎实数据支撑。机组采用智能线圈独立点火技术,大幅提升运行可靠性,启动成功率接近100%,从冷启动到满负载仅需30秒,可应对建站工程突发停电的应急补电需求,避免因停电延误施工进度。同时配备全铜无刷发电机,导电性更优,能保证500kW足功率稳定输出,电压、频率波动极小,适配施工中精密设备的用电需求。

  In addition to low cost, the reliability and power generation efficiency of the unit are also supported by solid data. The unit adopts intelligent coil independent ignition technology, greatly improving operational reliability, with a startup success rate of nearly 100%. It only takes 30 seconds from cold start to full load, which can meet the emergency power supply needs of sudden power outages in station construction projects and avoid delaying construction progress due to power outages. At the same time, it is equipped with a full copper brushless generator, which has better conductivity and can ensure stable output of 500kW full power with minimal voltage and frequency fluctuations, suitable for the power needs of precision equipment in construction.

  核心部件的优质配置,进一步筑牢机组稳定性。燃气控制系统、增压器、活塞等关键部件均采用行业知名品牌,可实现高效燃烧,发电效率可达35-38%,每立方米焦化气可发电1.6-1.8度,相较于传统发电机组能源利用率大幅提升。冷却系统采用水冷散热设计,能快速带走机组运行产生的热量,避免因过热影响运行,适配建站工程长时间连续发电的工况,日均连续运转24小时无压力。

  The high-quality configuration of core components further strengthens the stability of the unit. The key components such as gas control system, turbocharger, piston, etc. are all made of well-known brands in the industry, which can achieve efficient combustion and power generation efficiency of 35-38%. Each cubic meter of coking gas can generate 1.6-1.8 degrees of electricity, which greatly improves the energy utilization rate compared to traditional generator sets. The cooling system adopts a water-cooled heat dissipation design, which can quickly remove the heat generated by the operation of the unit, avoid the impact of overheating on operation, and adapt to the working conditions of long-term continuous power generation in station construction projects. It operates continuously for 24 hours a day without pressure.

  相较于秸秆发电机组,500千瓦焦化气发电机组更适配大型建站工程——秸秆发电受原料供应限制,且发电稳定性不足,而焦化气发电机组燃料获取便捷,可依托工地周边工业伴生气、焦化气,无需额外储备大量燃料,兼顾经济与便捷;同时其噪声控制在95分贝以内,低于传统柴油机组,减少对工地周边环境及施工人员的干扰,契合环保施工标准,避免因噪声超标面临整改风险。

  Compared to straw power generation units, 500 kW coking gas power generation units are more suitable for large-scale power station construction projects - straw power generation is limited by raw material supply and lacks power generation stability, while coking gas power generation units have convenient fuel access and can rely on industrial associated gas and coking gas around the construction site, without the need to reserve large amounts of fuel, balancing economy and convenience; At the same time, its noise is controlled within 95 decibels, lower than traditional diesel generators, reducing interference with the surrounding environment and construction personnel, meeting environmental construction standards, and avoiding the risk of rectification due to excessive noise.

  使用过程中,还有几点关键注意事项需牢记,进一步保障机组稳定运行。一是燃料需提前过滤,去除焦化气中的杂质、水分,避免堵塞燃气控制系统,影响燃烧效率与部件寿命;二是定期检查核心部件,尤其是增压器、活塞等易损耗件,建议每月排查一次,及时更换老化部件,降低故障概率;三是水冷系统需定期补充冷却液,保持散热通畅,高温天气可适当增加检查频次,防止机组过热停机;四是机组摆放需远离易燃易爆物品,搭建简易防护棚,规避施工工地的安全隐患。

  During use, there are several key precautions that need to be kept in mind to further ensure the stable operation of the unit. Firstly, the fuel needs to be filtered in advance to remove impurities and moisture from the coking gas, in order to avoid clogging the gas control system and affecting combustion efficiency and component life; The second is to regularly inspect core components, especially vulnerable parts such as superchargers and pistons. It is recommended to check them once a month and replace aging components in a timely manner to reduce the probability of failure; Thirdly, the water cooling system needs to be regularly replenished with coolant to maintain smooth heat dissipation. In high temperature weather, the inspection frequency can be appropriately increased to prevent the unit from overheating and shutting down; Fourthly, the unit should be placed away from flammable and explosive materials, and a simple protective shed should be built to avoid safety hazards on the construction site.
base64_image

  总结来说,500千瓦焦化气发电机组凭借扎实的参数配置、低廉的发电成本、稳定的运行表现,成为大型建站工程的发电神器。从日均12000度的发电量,到每度0.05-0.25元的成本优势,再到全铜无刷发电机、品牌核心部件的加持,全方位满足建站工程的用电需求,既帮企业节省电费开支,又助力绿色施工,兼顾实用性与环保性,是建站发电的优选方案。

  In summary, the 500 kW coking gas generator set has become a power generation tool for large-scale power station construction projects due to its solid parameter configuration, low power generation cost, and stable operating performance. From an average daily power generation of 12000 kWh, to a cost advantage of 0.05-0.25 yuan per kWh, and to the support of all copper brushless generators and brand core components, it fully meets the electricity needs of station construction projects. It not only helps enterprises save electricity costs, but also supports green construction, balancing practicality and environmental friendliness, making it the preferred solution for station construction and power generation.

  从实际应用来看,该机型不仅适配大型建站工程,还可用于焦化厂、工业园区等场景,既能解决可燃废气排放问题,又能实现自主供电,形成“废气利用-发电供电”的循环模式,兼顾经济效益与环保效益。相较于市电供电,其自主性更强,可避免电网停电、限电对施工的影响,尤其适合偏远地区、电网覆盖不足的建站工地,彻底解决用电难题。

  From practical applications, this model is not only suitable for large-scale station construction projects, but can also be used in coking plants, industrial parks and other scenarios. It can solve the problem of combustible gas emissions and achieve independent power supply, forming a "waste gas utilization power generation" cycle mode that balances economic and environmental benefits. Compared to mains power supply, it has stronger autonomy and can avoid the impact of power outages and restrictions on construction, especially suitable for remote areas and construction sites with insufficient power grid coverage, completely solving the problem of electricity consumption.

截屏,微信识别二维码